Clearing up at Burwell Fen — 3rd February 2013

We worked on Burwell Fen, near Wicken Fen though not on the Fen itself, clearing rubbish in support of the National Trust’s “Wicken Fen Vision”.

Photo - Clearing up at Burwell Fen Photo - Clearing up at Burwell Fen

Paul H. has a timelapse video of the event.

Autumn / Winter 2012 tasks

Here’s a look back at some of the work we got up to this Autumn. A fuller run-down may be found on our programme.

Photo - Clearing the moat at Melford Hall Photo - Planting a hedge at Anglesey Abbey Photo - Our reward of tea and cakes
Photo - Making a new path at Wimpole Photo - On our way to the tea room

From top-left, clockwise: Clearing the moat at Melford Hall (see Paul’s timelapse film of that day’s work); planting a hedge at Anglesey Abbey; our reward of tea and cakes; on our way to the tea room; making a new path at Wimpole (photos: Tom H., Peter J., Paul H. and Andy T.)

Photo - Autumn pruning at Anglesey Abbey
Photo - The finished job

Autumn pruning at Anglesey Abbey; the finished job (photos: Tom H. and Andy T.)

Return to Anglesey Abbey — 30th September 2012

Following from our trip the previous month, we returned to Anglesey Abbey on 30th September. Tom wrote the following about our trip: “We initially were along the banks of the mill stream, but on the public side of the stream and further away from the mill than I’d been before. We were clearing the banks and sawing down small saplings growing on the bank.

Photo - Clearing the steam bank and verge either side of the path Photo - Val slashing the steam bank

Clearing the steam bank and verge either side of the path; Val slashing the steam bank

Once we finished the banks up to the point that Rob Green had told us, we moved to the poplars closer to the mill. We cleared the growth of any saplings between the poplars.”

Photo - The poplars before we started Photo - Removing unwanted growth between the poplars Photo - The trees looking much more visible once we’d finished

The poplars before we started; removing unwanted growth between the poplars; the trees looking much more visible once we’d finished (all photos by Tom H.)

We managed to finish a little early and it was satisfying to see our work make a noticeable change.

Anglesey Abbey — 12th August 2012

Andy writes: “We met at Anglesey Abbey at 10am. There were fifteen of us. Janet, the warden met us and took us to where we were working. The task was clearing some vegetation from the side of a path next to the river…”

Photo - The team at work Photo - Lop ensuring the equipment was put to good use

The team hard at work; Lop ensuring the equipment was put to good use (left photo: Andy T.; right photo: Paul H.)

Photo - Clearing the river Photo - Finished!

Clearing the river; finished! (left photo: Paul H.; right photo: Andy T.)

Andy continues: “We were armed with bow saws, loppers and shears. It was hot, but because there was vegetation on both sides we were in the shade all day. I spent most of the day lopping and then at the end did some nettle shearing and pulling next to the smelly river.”